Custom Home Builder in Surrey, BC

New family homes with secondary suites, knockdown-rebuilds of 1970s and 1980s houses, coach houses, and small multi-unit homes where the City of Surrey's zoning allows them. In Cloverdale, Fleetwood, Newton, Guildford and Fraser Heights. South Surrey and White Rock are not part of this service area.

BC Housing licensed residential builder2-5-10 home warranty on every new homeStep Code planned from the first drawingItemized written quotes
A new two-storey family home with a basement suite under construction on a Surrey, BC street, framing and sheathing in place

In much of Surrey, the new house people want to build has a suite in it. The 1970s and 1980s split-levels and basement-entry houses of Newton, Fleetwood and Guildford often already have an unauthorized or older suite, and rebuilding gives the chance to do it properly: fire separation, sound control, separate entrances and services. Newer neighbourhoods such as Clayton were planned with coach houses on the lane. And the province's small-scale multi-unit housing rules have opened more options on many lots, within the limits of the City's zoning. This is the booking line for one BC Housing licensed residential builder working across Surrey north of South Surrey, who starts every project with a zoning and feasibility check on your address. South Surrey and White Rock are not part of this service area.

Local Knowledge

Building in Surrey: Lots, Permits, Warranty and Energy Rules

Suites done properly. Secondary suites are part of how Surrey lives, and a new house is the easiest place to build one well. That means a suite designed in from the start: fire separation and smoke alarms between units, sound-rated floors and walls, egress windows, its own entrance and laundry, and heating and ventilation that work for two households. It also means a permit, which protects you with insurers and lenders, and a suite that meets the BC Building Code rather than one that has to be explained later.

More units on more lots, carefully. Provincial legislation passed in 2023 required Surrey, like most BC municipalities, to allow more homes on many lots that were zoned for a single house: commonly a house with a suite and a coach house, or a small multiplex, depending on lot size and location. The City has its own bylaws, limits and fees for these, and areas near frequent transit, including the Surrey Langley SkyTrain corridor along Fraser Highway, may be treated differently. Before designing anything, the zoning for your specific lot is checked with the City.

Licensing and the 2-5-10 warranty. In BC, a new home must be built by a residential builder licensed with BC Housing, and it must be covered by third-party home warranty insurance under the Homeowner Protection Act. The standard coverage is known as 2-5-10: two years on materials and labour, five years on the building envelope including water penetration, and ten years on the structure. You can look up a builder's licence in BC Housing's public registry before you sign anything, and you should. Owner-builder authorization is a separate route with its own requirements, including an exam.

Step Code: how energy rules shape the design. New homes in BC are built to the BC Energy Step Code, which sets energy performance levels in steps. The provincial minimum went up in 2023, and many municipalities, including several in the Lower Mainland, require a higher step or a low-carbon heating system. In practice that means an energy advisor models the house at the drawing stage, and the house is tested for airtightness during and after construction. Designing for it from the start costs much less than fixing a design that misses the target at permit time. the City of Surrey confirms the step your project needs.

Before the excavator: hazmat survey, trees and permits. If the house on your lot was built before 1990, WorkSafeBC's asbestos requirements call for a hazardous materials survey by a qualified person before demolition or renovation, and asbestos found in it is removed by a licensed abatement contractor before the building comes down. Most municipalities want that survey with the demolition permit. Protected trees usually need a permit and an arborist report, and services such as water, sewer and storm connections are often renewed for a new house. None of this is unusual, but all of it takes time, so it goes into the schedule from the first meeting.

Where We Work

Serving Surrey & Surrounding Areas

Builder licensing, the public licensed builder registry, owner-builder authorization and home warranty insurance are administered by BC Housing. Energy performance requirements are set out in the BC Energy Step Code and the BC Building Code. Hazardous materials surveys and asbestos abatement are covered by WorkSafeBC's asbestos requirements. Zoning, permits, tree protection and servicing for your address are decided by the City of Surrey. Nothing on this site is legal or planning advice; confirm your project's requirements with the municipality.

Questions

Frequently Asked Questions

Do I need a licensed builder for a new house in BC?

Yes, unless you qualify and are approved as an owner-builder. A new home must be built by a residential builder licensed with BC Housing and covered by home warranty insurance. Ask for the licence and check it on BC Housing's registry.

What does the 2-5-10 warranty cover?

Two years on materials and labour, five years on the building envelope including water penetration, and ten years on the structure, subject to the policy's terms. The warranty is provided by a third-party insurer, not by the builder alone.

How much does it cost to build a custom home in Surrey?

It depends on size, design, finishes, the lot and the energy step required. Broad per-square-foot estimates are on the cost page. A real number comes from drawings and an itemized quote.

How long does a custom home take?

Design and permitting often take many months, and construction commonly takes a year or more, depending on the size of the house, the lot and how long the City of Surrey takes to issue permits. The schedule is set out at the start and updated as it moves.

Can you work with my own architect or designer?

Yes. Many projects come with drawings from an architect or designer. Others start with design-build, where design and construction are planned together around the budget.

What zoning allows on my lot?

Only the City of Surrey can answer that for a specific address. Provincial rules introduced in 2023 and 2024 mean many lots that were single-family now allow suites or more units, but the details depend on lot size, location and local zoning. A zoning check is the first step, before any design.

Do you build in South Surrey or White Rock?

Not through this site. It covers Cloverdale, Clayton, Fleetwood, Newton, Guildford, Fraser Heights and the rest of Surrey north of South Surrey.

Ready to Get Started?

Call 778-900-1854 or send the form for a written quote for custom home building in Surrey.

By submitting this form, you agree to be contacted by phone, text, or email about your request. You can opt out at any time. Your details go only to the one local licensed residential builder who handles your job — nobody else.

Call Now: 778-900-1854